Official portal of ARNet Infratech Sdn Bhd

Highway fibre infrastructure

One trusted view of every highway fibre project

ARNet PRISM brings site activity, progress, RFIs and close-out records for highway works into a single, auditable portal for ARNet, PLUS and LLM.

Notices

  • PRISM portal is open. Register or sign in; new accounts are approved by the ARNet administrator.
  • Account requests are handled by the ARNet project administrator.

Highway projects

Main highway packages

Fibre infrastructure works along the PLUS highway network. Progress figures are published to signed-in users once the baseline has been approved.

  • WP-01 · NSE

    PLUS Highway — Package 1

    State
    Johor
    Class
    Highway
    Status
    Ongoing

    Section, KM range and progress to be confirmed

  • WP-02 · LINKEDUA

    PLUS Highway — Package 2

    State
    Johor
    Class
    Highway
    Status
    Planning

    Section, KM range and progress to be confirmed

  • Package to be confirmed

    Further highway packages

    Further highway packages will be listed here once ARNet confirms them.

Package names and status come from the client's prototype (Rev 14.33) and still need ARNet's confirmation. Route images are illustrations, not survey data.

Secure records

Evidence you can rely on, and nobody can pass off as their own

Every file uploaded to PRISM is kept as the original and shown with a permanent ARNet stamp.

  • ARNet logo watermark on every image and video frame
  • Capture date and time, GPS position and uploader
  • Revision history: earlier files are never overwritten
  • Downloads limited to the accounts assigned to each project

Planned capability

KMZ / KMLAlignment and as-built routes
JPG / PNG / HEICSite photos
MP4 / MOVSite video
PDFDrawings, reports, RFIs
XLSX / CSVQuantities and registers
DWG / DXFCAD drawings

How it works

From site to approved record

  1. 1

    Contractor submits

    A single-page daily diary with photos, captured on site.

  2. 2

    PE verifies

    The site engineer checks quantities, photos and the segment.

  3. 3

    PM approves

    The approved diary is locked and counted as actual progress.

  4. 4

    PLUS & LLM view

    Authorities see approved highway progress and approved RFIs.

Sign in to ARNet PRISM

Sign in with your PRISM username or your Microsoft work account. New accounts are approved by the ARNet project administrator for each assigned project and package.

Sign in now